[opensource-dev] Snowstorm Daily Scrum Summary - 08/26/2010
Esbee Linden (Sarah Hutchinson)
esbee at lindenlab.com
Thu Aug 26 17:41:34 PDT 2010
Date: Thu Aug 26
Daily Scrum Summary also available online: https://wiki.secondlife.com/wiki/Snowstorm_Daily_Scrum_Archive
== GENERAL NOTES ==
No Daily Scrum tomorrow. Sprint Review Meeting Scheduled from 6-9am PT.
== DAILY SCRUM ==
=== Aimee ===
PAST
Reviewed and pulled Merov's llkdu fixes.
Attended Snowstorm OH.
Imported and merged double-click teleport patch from Snowglobe.
FUTURE
Finish off double-click teleport and get a build up for design review.
Team meeting.
Howard's software dev meeting.
Get back to importing Snowglobe build fixes
Check with CG about renaming TeamCity projects to Viewer-Release-Builds, and Viewer-Project-Builds so that they sort together in the project list. May also need Viewer-Aimee's-Builds as I seem to be accumulating enough for my own project :)
IMPEDIMENTS
None
=== Tofu ===
OOO
=== Oz ===
PAST
essentially no Snowstorm work yesterday
FUTURE
update patch from Thickbrick for texture alignment, get it reviewed.
get archive of my last Office Hour posted
todays Office Hour
IMPEDIMENTS
Non-Snowstorm tasks (no help for it)
=== Merov ===
PAST
LLKDU in viewer-development: review. Logged VWR-20946 to track this. Got -1 review by Mani: Linux doesn't load llkdu. Aimee to pull the change though so we get Windows at least to build correctly.
Add "Sit" to the "pie" menu: Got everything ready for review and pull. Created a merov-viewer-development-features repo and TeamCity tasks to share, review and test. Q is: how do we move swiftly with the rest of the process?
Unplanned: lots of discussions on llkdu with lab folks...
FUTURE
LLKDU in viewer-development: fix the Linux issue.
Add "Sit" to the "pie" menu: Design review (VWR-20711)
Add "Sit" to the "pie" menu: Test the ability to sit "anywhere" (VWR-20712)
IMPEDIMENTS
Need clarity as to how we cover the "review, vet, pull" steps of the process in a swift and efficient way (see http://wiki.secondlife.com/wiki/Viewer_Integration_and_Release_Processes)
=== Q ===
OOO
=== Esbee ===
PAST
Hold first Product Backlog & Idea OH
Review texture alignment build for Oz
Discussion about UI Toolkit
Discussion about UI customization
FUTURE
Get Resident ideas and feedback into the idea tab of backlog
Document idea submission process
Review Tofu's list of changes from viewer-public
Team Meeting
Howard's 'Quick or Dead' Meeting
IMPEDIMENTS
None
=== Paul ===
PAST
BUG EXT- 8722 (Appearance > 'Wearing' tab: Add Take off / Detach function to the gear menu)
In progress 60%.
FUTURE
BUG EXT- 8722 (Appearance > 'Wearing' tab: Add Take off / Detach function to the gear menu)
IMPEDIMENTS
none
=== Andrew ===
PAST
Task VWR-20702 (Snowstorm Sprint 2: As a User who's customized the bottom bar of the Viewer UI, I also want to be able to control the order of the buttons as they appear in the UI.)
WIP. Working on D&D similar to favorites, will finish tomorrow.
FUTURE
Task VWR-20702
analyze d&d in favorites, add similar to bottom tray
change order of buttons shrinking and disappearing depending on button locations
save order in settings and use it when creating bottom tray
investigate inconsistency in distance between buttons
IMPEDIMENTS
Order of buttons shrinking and disappearing
=== Vadim ===
PAST
Task VWR-20964 (Enable sidebar to track detaching/attaching tabs):
70% complete.
FUTURE
create repo to work on detachable tabs, add my code for VWR-20964, integarte with Sergey's code.
figure out how else to help Sergey
IMPEDIMENTS
none
=== Sergey ===
PAST
Task (VWR-20696) Write code to allow for undocking of a sidebar tab
Task (VWR-20697) Write code to allow for redocking of a sidebar tab
Fixed undocked tab visibility changes when switching tabs in Side Tray.
Added undocking multiple tabs from Side Tray.
Fixed Side Tray expanding/collapsing on undocking/undocking tabs.
FUTURE
Task (VWR-20696) Write code to allow for undocking of a sidebar tab
Task (VWR-20697) Write code to allow for redocking of a sidebar tab
Integrate with Vadim's code to complete both tasks tomorrow no significant bugs are found
IMPEDIMENTS
need design soon
=== Anya ===
PAST
GH & new jira demo
Followup on future workflow and PE process
Played with new jira
Investigated platform testing status
maintenance/org
FUTURE
VWR-20702 design - button shrinking/disappearing - follow up with Ben
establish procedure for taking EXTs from old PE backlog to particular sprint
IMPEDIMENTS
out thu-fri next week
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.secondlife.com/pipermail/opensource-dev/attachments/20100826/fb34d964/attachment-0001.htm
More information about the opensource-dev
mailing list