[opensource-dev] Daily Scrum Summary - Friday, May 13
Anya Kanevsky
akanevsky at productengine.com
Tue May 17 00:10:16 PDT 2011
Sprint 15, ends 05.16.11 Friday, May 13 Team Status
------------------------------
Oz Linden
------------------------------
*PAST*
- Merge Monkeying
- Viewer Evolution User Group
- GPU table testing
- windlight project review
*FUTURE*
- Check in GPU table & manual test script
*IMPEDIMENTS*
- none
Grumpity ProductEngine
------------------------------
*PAST*
- storm triage and sprint cleaning
- QA roundup
*FUTURE*
- VWR triage
- Sprint retrospective
- Discuss with Oz:
- add "verify" fix version?
- add "unactionable" transition to needs more info state.
- other jira transitions specified in VWR triage doc?
- find (push to create?) list of currently supported versions.
- is it possible to limit (or is it already limited?) who can
"acknowledge" vwr issues?
- is it possible to automatically uncheck approvals when issue is
reopened by QA?
*IMPEDIMENTS*
- none
Paul ProductEngine
------------------------------
*PAST*
- TASK STORM-1202 (Time spin control)
- Implemented. Sent for review.
- STORM-1205 (Add "Environment" tab to the "Region/Estate" floater)
- WIP. Investigating. Not providing the estimate until i've not
investigated the task.
*FUTURE*
- STORM-1205 (Add "Environment" tab to the "Region/Estate" floater)
*IMPEDIMENTS*
- none
Seth ProductEngine
------------------------------
*PAST*
- TASK (STORM-1244) Implement Environment Settings floater
- XUI cleanup.
- Investigating sky and water preset managers.
*FUTURE*
- TASK (STORM-1244) Implement Environment Settings floater
- Estimated: 4 - 6 hours
*IMPEDIMENTS*
- none
Vadim ProductEngine
------------------------------
*PAST*
- Task STORM-1200 (Create fixed sun presets):
- Submitted.
- Task STORM-1245 (Implement new way of storing/applying environment
settings):
- WIP. Finished with local presets. Adding region settings support
(r/o).
*FUTURE*
- Complete STORM-1245, including integration with Seth's Environment
Settings floater.
- Create JIRA tickets for remaining tasks.
*IMPEDIMENTS*
- none
Andrey ProductEngine
------------------------------
*PAST*
- picked up 2.6.6 release build r229662
- smoke test has been failed by EXP-749 (the issue with voice indicator)
- tested CHOP-663 according to the test plan on on wiki on all platforms
- continued with STORM-1027 testing
- testing on OSX and Windows - done
- on Linux - in progress
*FUTURE*
- pickup the latest v-d build and verify integrated issues
*IMPEDIMENTS*
- none
Wolfpup Lowenhar
------------------------------
*PAST*
- Replaced Video card in Windows system.
- Attended Viewer Evolution User Group meeting.
- Working inworld (this is part of testing localy built viewers).
- Checking on horses and bundles, plus work on note cards for them.
- Desiding on what type of build to work on next.
- STORM-941 : Acceptance Criteria added.
- STORM-859 : Tested Ardy's patch by manualy applying it to local
repository.
*FUTURE*
- STORM-859 : Create local and online repositories and RB issue so this
can go through the steps needed for intergration.
*IMPEDIMENTS*
- Getting Autobuild system and security software to play nicely on my
system.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.secondlife.com/pipermail/opensource-dev/attachments/20110517/d04fb157/attachment-0001.htm
More information about the opensource-dev
mailing list